Quartz floor coating specification: Section 09 67 23 guide spec
This is a complete CSI 3-part guide specification for double-cast colored quartz flooring under MasterFormat Section 09 67 23. It is the commercial build: two full broadcast passes to rejection, fully encapsulated, detailed into coves and drains for washdown service. Architects, engineers, and general contractors can copy it into a project manual as written or edit the bracketed values. It reflects the process Bel Covo crews run in production under the RESA methodology: Resin-Encapsulated Seamless Aggregate.
Download the quartz guide spec (PDF)
The same specification formatted as a project-manual document: cover block, three parts, numbered articles. Print it, red-line it, or drop it into your spec book.
How do you use this guide specification?
- Keep both moisture tests. Part 3 requires ASTM F1869 and ASTM F2170 together. Editing the section down to one test is how a floor passes on paper and blisters a season later.
- Decide the sub-base by exposure. The urethane-modified cement option in Part 2 belongs in kitchens and steam-cleaned rooms, not in a dry warehouse.
- Schedule the details, not just the field. Cove height, drain terminations, and curb transitions are where a washdown floor fails first, long before anything goes wrong out in the open middle of the room, so every one of them belongs in the room schedule rather than in a field decision on the day.
- Edit the brackets, keep the sequence. Spread rates, moisture limits, cove dimensions, and mockup sizes are the intended editing points. The coat order and the Part 3 quality-control articles are the process itself.
Section 09 67 23: quartz floor coating
Part 1: general requirements
1.1 Summary
Work of this section includes resinous quartz flooring: substrate preparation, moisture testing, moisture vapor barrier primer, crack and joint treatment, two pigmented body coats each receiving kiln-dried colored quartz broadcast to rejection (double cast), media recovery between casts, a clear encapsulating coat, a matte urethane topcoat, and integral cove base where scheduled.
1.2 Related sections
- Section 03 30 00, Cast-in-Place Concrete: slabs to receive resinous flooring.
- Section 03 35 43, Polished Concrete Finishing: mechanically polished floors where a polish is specified instead of a coating.
- Section 07 26 00, Vapor Retarders: under-slab moisture protection.
- Companion guide specifications under this same section number: flake broadcast flooring and metallic pigmented resin flooring.
1.3 References
- ICRI Guideline 310.2R, Selecting and Specifying Concrete Surface Preparation (concrete surface profile, CSP).
- ASTM F1869, Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride.
- ASTM F2170, Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes.
- ASTM D4060, Standard Test Method for Abrasion Resistance of Organic Coatings by the Taber Abraser.
Article 3.1 requires both ASTM F1869 and ASTM F2170. They measure different quantities and neither one substitutes for the other. Do not edit this section to accept one test in place of the other.
1.4 Definitions
- Broadcast to rejection: continuous application of aggregate into wet resin across the entire field until additional media is no longer accepted, producing 100 percent coverage at uniform density.
- Double cast: two full broadcast passes, each into its own wet body coat, with media recovery between them. It is what separates a quartz system from a single-broadcast floor and is the reason for the system’s build height and wear life.
- Encapsulation: complete coverage of the broadcast aggregate under clear coats, leaving no exposed media in the wear surface.
- Encapsulation coat: the clear coat placed over the recovered broadcast to bury the aggregate and set the texture of the floor.
- Topcoat: the final coat over the encapsulation coat. It adds chemical and abrasion resistance, sets the sheen, and slightly reduces texture. It encapsulates nothing.
- CSP: concrete surface profile per ICRI 310.2R, numbered 1 (nearly flat) through 10 (very rough).
- Absorption: penetration of the primer resin into the open pore structure of the prepared slab. Surface profile describes the shape of the surface. Absorption describes whether that surface will take resin into it. Adhesion and resistance to moisture vapor drive both depend on absorption, not on profile alone.
- 100 percent solids: a resin carrying no solvent and no water, so wet film thickness and cured film thickness are equal and nothing evaporates out of the placed coat.
1.5 Submittals
- Product data for each coat in the Article 2.2 build, including published spread rate, pot life, recoat window, and cure schedule.
- Quartz color blend samples, [2] blends minimum for selection.
- Reports for both moisture tests required by Article 3.1, before material order.
- Mockup: [50] square feet minimum, demonstrating broadcast density, quartz blend, slip resistance, and final sheen.
- Where the project includes washdown, thermal shock, or food-service exposure, submit the Article 2.5 sub-base proposal with the exposure conditions it addresses.
1.6 Quality assurance
- Installer qualifications: trained or approved by the system manufacturer, with [3] years minimum installing full-broadcast resinous systems.
- Resins for the vapor barrier, primer, and body coat shall be 100 percent solids. Solvent-diluted and water-based epoxies are not acceptable in those positions.
- Application at manufacturer-published production rates and spread rates.
- The approved mockup is the standard of comparison for the work.
1.7 Project conditions
- Substrate and ambient temperature within manufacturer limits and at least [5] degrees F above dew point during application and cure.
- Slab moisture within the Article 3.1 limits and holding there for [48] hours continuously before the first coat. A slab does not dry on the same schedule the air does.
- Building enclosed and other trades off the work area from primer through final cure.
1.8 Warranty on the installed work
- Workmanship warranty on the installation as stated on the accepted proposal. Manufacturer material warranties pass through to the owner.
Part 2: products
2.1 Basis of design
The basis of design is RESA Quartz by Bel Covo (Resin-Encapsulated Seamless Aggregate). This section states process and performance requirements rather than a named manufacturer product line. The installer submits the specific resins proposed for each coat under Article 1.5, for approval against the requirements of Article 2.3.
2.2 System build
| Coat | Material | Application rate | Purpose |
|---|---|---|---|
| 1 | Moisture vapor barrier epoxy, 100 percent solids | [75 to 110] SF per gallon by slab porosity | Absorb into the slab, bond the system, resist vapor drive |
| 2 | Pigmented epoxy, 100 percent solids, first cast | [100] SF per gallon | Receive the first quartz broadcast at working viscosity |
| 3 | Pigmented epoxy, 100 percent solids, second cast | [100] SF per gallon | Receive the second quartz broadcast and build the wear course |
| 4 | Encapsulation coat: clear polyaspartic | Per data sheet, sufficient to fully encapsulate | Bury the recovered broadcast, set the texture, UV stability |
| 5 | Topcoat: matte aliphatic urethane | Per data sheet | Chemical resistance, abrasion resistance, de-gloss, slight texture reduction |
Quartz broadcast to rejection consumes roughly [1/2] pound of media per square foot per cast. Total system build: [1/8 to 3/16] inch across both casts.
Coat 4 is specified polyaspartic because the encapsulation coat is the coat that takes the UV, and there is no truly UV-stable epoxy: a clear epoxy chalks and ambers within roughly [18 to 36] months where the floor sees direct sun or gas-charged high-bay lighting. A clear epoxy may be substituted only on interior floors with neither exposure. Where the heavy-duty kitchen build in Article 2.5 is scheduled, the encapsulation coat is pigmented Novolac epoxy instead: epoxy holds up better under impact and heavy abrasion, and a commercial kitchen has no UV exposure to protect against.
Coat 5 is specified matte. A gloss wear surface shows traffic patterns at doors and along the main lanes within the first years of service. A matte aliphatic urethane holds a subtle eggshell sheen, adds chemical and abrasion resistance over the encapsulation coat, does not telegraph traffic lanes, and slightly reduces the broadcast texture underfoot.
2.3 Materials
- Moisture vapor barrier epoxy: 100 percent solids, formulated for placement over concrete carrying elevated moisture vapor emission. It is the primer on every floor of this section, not only on floors that fail Article 3.1.
- Body coats: pigmented 100 percent solids epoxy, color as scheduled, of a viscosity that accepts broadcast media to full depth throughout the working time of a mixed batch.
- Broadcast media: kiln-dried colored quartz, graded and blended as scheduled and as approved on the mockup.
- Encapsulation coat: clear polyaspartic, UV stable, of sufficient body to bury the recovered broadcast surface in the specified number of coats. Low-odor formulations are preferred on occupied work. Where the Article 2.5 heavy-duty build is scheduled: pigmented Novolac epoxy in place of the polyaspartic.
- Topcoat: aliphatic urethane, matte sheen, with published abrasion data per ASTM D4060. Where slip resistance is scheduled, the topcoat carries the specified additive at the rate demonstrated on the mockup.
2.4 Accessories
- Joint filler: 100 percent solids moisture vapor barrier epoxy blended with clean, dry [30] sieve blast sand, placed and shaved flush before the primer coat. Semi-rigid polyurea joint filler is not acceptable under this system. An epoxy coating does not develop a bond to a polyurea filler, and the joint lines telegraph and open.
- Crack repair: rout and fill with the same 100 percent solids epoxy mortar used for joints, unless the approved repair method for the project states otherwise.
- Integral resin cove base: standard cove is [4] inch height by [1/8] inch thickness with a [1-1/2] inch radius at the floor. Heights from 2 inch through 8 inch may be scheduled in place of the standard. Cove base is the default, not an option, in washdown and food-service areas.
- Drain and curb detailing: terminate the system into drain flanges and over curbs continuously, with no field joint at the transition.
2.5 Urethane-modified cement sub-base (optional)
Where the schedule calls for it, place a urethane-modified cement mortar sub-base over the primer and under the body coats. It is the strongest available insurance against moisture vapor damage and tolerates thermal shock to roughly [750] degrees F, which is why it is specified in commercial kitchens, commercial restrooms, and steam-cleaned areas. It carries a material premium over the standard build and is not warranted for general dry-area work. Specify it by exposure, not by default. The full heavy-duty build runs the sub-base pigmented, broadcasts quartz into it, encapsulates in pigmented Novolac epoxy, and takes a pigmented urethane topcoat where scheduled.
Part 3: execution
3.1 Examination
- Moisture, both tests required. Test per ASTM F1869 [3 lb per 1,000 SF per 24 hr maximum] and per ASTM F2170 [80 percent RH maximum]. ASTM F2170 reports how much moisture the slab is holding right now. ASTM F1869 reports how much moisture is leaving the slab across 24 hours. The two readings separate: a wet slab under humid air at an equalized temperature emits very little, so it can pass the calcium chloride test and still fail the relative humidity probe. That slab will drive moisture into the coating as soon as the temperature changes. Run both, and do not proceed on one result.
- Substrate: verify slab is cured [28] days minimum, uncoated or mechanically stripped, and free of curing compounds, sealers, and contamination.
- Grade: record low spots exceeding a 4 percent slope between two adjacent grade points, and verify slope to drain where drains are present. A fluid-applied coating follows the floor plane. Report each spot and present remediation options before application.
3.2 Preparation
- Mechanically prepare the substrate by diamond grinding or shot blasting to [CSP 3] minimum, verified against an ICRI comparator.
- Verify absorption, not profile alone. The objective of the mechanical pass is to remove the cream layer and open the pore structure so the primer resin penetrates. A profile number by itself does not prove that happened. A hard, dense, or over-troweled slab can read CSP 3 from an aggressive scratch pattern and still refuse resin. Verify by placing water droplets on the prepared surface at [3] locations per 1,000 SF: each droplet shall darken and absorb within [60] seconds. A droplet that beads means a closed surface, whatever the measured profile. Continue grinding, and report slabs that will not open.
- Joints and cracks: fill scheduled joints and routed cracks with the Article 2.4 epoxy mortar before the primer coat. Grind and mask edges, drains, and terminations.
3.3 Application
Each step below states its objectives, its hazards, and the key best practices and methods that matter to the end result.
1. Slab readiness
- Objectives: place the first coat only on a slab that has held below the Article 3.1 limits for [48] hours continuously.
- Hazards: coating on the first dry day after a wet or cold stretch traps the water the slab took on during that stretch. Slabs change temperature and moisture content far more slowly than the air around them, so a warm dry morning proves nothing about the slab. The result is blistering and delamination months after the crew leaves, when the trapped vapor expands.
- Key best practices and methods: leave the relative humidity probes in place and read the trend, not a single number. Dehumidify the enclosed space and hold it. A falling probe trend under a stubbornly high calcium chloride reading means the slab is giving up its moisture and the drying is working.
2. Vapor barrier primer
- Objectives: a heavy, fully absorbed coat of 100 percent solids moisture vapor barrier epoxy at [75 to 110] SF per gallon, set by the porosity of the slab.
- Hazards: an unmonitored spread rate. Wet film equals cured film on a 100 percent solids resin, so nothing evaporates and nothing recovers a starved coat. The second hazard is viscosity. A two-part resin thickens from the moment it is mixed, and a thickened resin sits on the slab instead of going into it. A batch left standing in the container will go exothermic, reaching 150 to 180 degrees F within minutes, and exothermed resin is broken down and brittle. Do not place it.
- Key best practices and methods: verify the rate by material consumed against area covered. Mix batches small enough to place at working viscosity, and keep material out of sun and heat. Return after [2] hours and look for spots where the resin disappeared into the slab, then prime those again. On a slab porous enough to drink the whole coat, squeegee a tight skim coat first and let it tack so it seals the pores, then place the full primer coat at the normal rate.
3. First cast
- Objectives: quartz broadcast to rejection into a wet pigmented body coat, 100 percent coverage of the field at uniform density, with the media seated and interlocked in the resin rather than resting on it.
- Hazards: resin that flashes before the media lands. Broadcast depth is what interlocks the aggregate and gives the floor its structure, not only its color. If the first area rolled is already tacking while the last area is still wet, the two areas take different amounts of media and finish differently.
- Key best practices and methods: work in bays sized to the working time of one mixed batch, and broadcast into each bay while it is still wet. Rotate broadcast positions to even out the field.
4. Recovery and second cast
- Objectives: unbonded media off the field and the surface knocked down, then a second body coat and a second full broadcast to rejection.
- Hazards: casting the second coat over unrecovered media traps loose quartz in the build. Skipping the second cast leaves a single-broadcast floor being called a quartz system.
- Key best practices and methods: Scrape the entire field in two opposing directions to remove the sharp edges of embedded media, vacuum, then place the second body coat and repeat the broadcast within the recoat window.
5. Final recovery
- Objectives: all unbonded media off the field, and the broadcast surface knocked down flat.
- Hazards: unbonded media and sharp standing grains telegraph through the encapsulation coat as texture defects and consume encapsulation material.
- Key best practices and methods: Scrape the entire field in two opposing directions to remove the sharp edges of embedded media, then vacuum. Screen the surface before the next coat.
6. Encapsulation coat
- Objectives: full encapsulation of the broadcast layer under the scheduled encapsulation coat at the specified build, with no media exposed in the wear surface. This coat sets the texture; the topcoat sets the sheen.
- Hazards: exposed media in the wear surface is an encapsulation failure, not a texture option. On a washdown floor it is also a cleanability failure. The other hazard is material kept in the pot too long: pot life falls with ambient temperature, and most epoxies give about 10 minutes at 70 degrees F but only 3 or 4 minutes at 90 degrees F.
- Key best practices and methods: place enough body to bury the recovered profile, in batches sized to the pot life at the day’s temperature. Confirm encapsulation by hand across the field before the topcoat.
7. Topcoat
- Objectives: a matte aliphatic urethane topcoat at the specified build, setting the final sheen and slip resistance, adding chemical and abrasion resistance, and slightly reducing the overall texture.
- Hazards: skipping this coat to save a day. The encapsulation coat alone leaves the floor glossier, less chemically resistant, and prone to showing traffic lanes.
- Key best practices and methods: apply within the recoat window of the encapsulation coat. Verify sheen and slip resistance against the approved mockup under the room’s own lighting.
8. Cove and details
- Objectives: integral cove base, drain and curb terminations, and transitions matching the approved mockup.
- Hazards: details improvised in the field rarely match the mockup the owner approved, and a cove or drain detail is where a washdown floor fails first.
- Key best practices and methods: install per the approved mockup at the scheduled locations and dimensions.
3.4 Field quality control
- Verify spread rates by material consumption against area covered, per coat, and record them.
- Verify broadcast consumption against the [1/2] pound per square foot per cast expectation, and investigate any bay that falls short.
- Inspect the primer coat [2] hours after placement for starved and absorbed-out areas, and re-prime before proceeding.
- Inspect the cured field for pinholes, fisheyes, unencapsulated media, and roller lines. Repair per manufacturer method before the next coat or before acceptance.
3.5 Protection
Protect finished surfaces until full chemical cure. Prohibit traffic, washdown, and chemical exposure before the cure time the topcoat data sheet states.
Which resinous system should you specify?
Each broadcast system gets its own section because the products and the execution genuinely differ. A quartz floor is two casts, not one, and a metallic floor is not a broadcast system at all. Specify the system that matches the floor.
Selected quartz and resinous flooring projects
Ready to price a quartz floor instead of specifying one? The online quote calculator prices the system and its options live, and the epoxy flooring page covers the same family for commercial buyers. Or call (888) 852-3528.
Frequently asked questions
What does double cast mean in a quartz flooring spec?
When is a urethane-modified cement sub-base worth specifying?
Do I need both ASTM F1869 and ASTM F2170 moisture tests?
Should the joints be filled with semi-rigid polyurea?
Is cove base required on a quartz floor?