Concrete driveway cost in Texas runs $6.96 to $16.43 a square foot with us, installed, for a typical 400 to 900 square foot driveway. Our standard driveway, a 5 inch slab with rebar, starts at $8.64. Thickness, steel, soil prep, and finish decide where you land. Texas adds costs a bid from a cooler state misses. North Texas has Blackland clay, and East Texas ground stays damp. Summer slabs top 100 degrees F, and the Wichita Falls area gets three to five hard freezes each winter.
We pour driveways across North Texas, in Sherman, Wichita Falls, Gainesville, and Stephenville, and across East Texas, in Texarkana, Marshall, Mount Pleasant, and Paris. The Texas state hub shows where we work. The Texas concrete driveway cost page has the live calculator.
How much does a concrete driveway cost per square foot in Texas?
| Driveway type | Price per sq ft | What you get |
|---|---|---|
| Basic 4” slab | Set by thickness in the quote tool | Broom finish, wire mesh, standard subbase |
| Standard 5” reinforced | From $8.64 | #4 rebar grid, thicker subbase, broom or swirl finish |
| Heavy-duty 6” | Set by thickness in the quote tool | #4 rebar on 12” centers, engineered subbase, built for trucks, RVs, trailers |
| Stamped or decorative | From $12.57 on a 5” slab | Color-integrated mix, pattern stamping, sealed finish |
Those prices cover material, labor, digging, the rock base, forms, finishing, and the saw-cut control joints. They don’t cover tearing out an old driveway, extra base work on Blackland clay, or grading on a lot that slopes more than 2 percent. If you’re pricing a driveway replacement, tear-out adds $2.30 a square foot. That assumes an old 4 inch slab with no steel in it. A thicker slab, one full of rebar, or an asphalt drive can cost more to break out.
How much will your Texas driveway cost by size?
Price follows square footage, but not in a straight line. Small driveways cost the most per foot, because the fixed costs of the job spread over less concrete. These totals are before the drive cost, which is our trip out to your place.
1-car (200 to 300 sq ft): $1,950 to $4,650 at 250 square feet. This is the highest price per foot on the list.
2-car (400 to 600 sq ft): $4,350 to $10,300 for a 600 square foot driveway. It’s the most common driveway we pour in Texas.
3-car or extended (600 to 900 sq ft): $6,400 to $15,100 at 900 square feet. We see these a lot on acreage around Sherman, Decatur, and Mount Pleasant.
Circular or long approach (800 to 1,200 sq ft): priced per job, after we see the layout. Curves take more work than the footage shows. The form boards have to be cut and bent to hold the curve, and more concrete goes to waste at the edges. The finishers also move slower, because the trowel changes direction every few feet instead of sweeping straight across. So the labor runs well past what a straight driveway the same size would take. We pour these on estate lots in Stephenville, Decatur, and around Texarkana, where a curved drive frames the front of the house.
Small pours pay the most per foot
The drive cost, our trip out to your site, stays about the same whether you pour 200 square feet or 900. Long hauls out to Wichita Falls and East Texas add mileage on top. On a small slab, that fixed cost adds a lot to every square foot. On a big one, it barely shows. So while the crew is already there, adding a walkway, a patio pad, or more driveway costs far less per foot than booking it later. See your price for a combined pour.
What drives the price of a concrete driveway in Texas?
Three things move the price most: how thick the slab is, what soil sits under it, and the summer heat you pour in.
Slab thickness
Going from 4 inches to 6 inches takes about 50 percent more concrete. The total job goes up far less than that, because the digging, forms, and finishing labor stay about the same. Lots of Texas acreage sees trucks, dual-rear-wheel pickups, RVs, or boat trailers. If yours does, don’t skip the 6 inch slab. ACI 360 is the design guide for slabs on the ground, and we build to it in North and East Texas alike.
Texas soil: Blackland clay, caliche, and silt loam
Texas gives us three kinds of ground, and each one changes the bid a different way. Soil work can move the price about as much as slab thickness does.
Blackland clay. The Blackland Prairie counties, from Sherman and Plano east through Greenville and Sulphur Springs, sit on deep expansive clay. Expansive means it swells when wet and shrinks when dry. Its plasticity index runs above 30, which is a lab number for how much it moves. On that clay we dig 10 to 14 inches below the slab, lay geotextile fabric, and build a thicker packed gravel bed. That keeps the clay from working up into the rock over time. We price that work per job, once we’ve seen the lot.
Caliche and limestone. West of I-35, around Decatur, Bowie, and Wichita Falls, the ground turns to bands of caliche and limestone gravel. Caliche is a hard, chalky layer of soil that sits near the surface. Where it’s shallow, digging turns into rock work, and we price that per job too.
Silt loam. The East Texas piney woods, around Texarkana, Marshall, Longview, and Mount Pleasant, sit on silt loam. It holds weight better than Blackland clay. But the air there runs 70 to 80 percent humidity through the warm months, per NOAA climate normals. The base is cheaper to prep. Curing is the harder part.
No single slab spec fits all of Texas. The right driveway in Sherman is wrong for Wichita Falls, and neither one fits Marshall. Around Plano and Sherman, the clay has a plasticity index of 30 or more. It can swell four inches between February and August, and it tears slabs with no steel apart at the corners. West of Decatur, caliche runs close to the surface, and about one site in four turns the digging into rock work. East Texas sits on firmer silt loam, but water vapor keeps pushing up through the slab into October. In all three places, we pour the same 4,000 PSI mix over the same #4 rebar grid. What changes is the base under it, how far apart we cut the joints, and how we cure it. That’s why two Texas driveways of the same size can get two different bids from us.
Summer heat
On a North Texas summer afternoon, the air hits 95 to 105 degrees F. Fresh concrete in direct sun runs 20 degrees hotter than that. That’s when ACI 308 hot-weather steps apply. We spray an evaporation retardant, which slows drying, between bull floating and the final finish. We keep the water-cement ratio at 0.45 or lower, so the mix isn’t watered down. And we pour early, so the trucks arrive before the pavement heats up. Skip those steps and you get plastic shrinkage cracks, the thin wandering lines you see on new July driveways. You also get a soft top quarter inch that wears unevenly under tires. Curing counts for more in Texas than it does in cooler states.
Is concrete or asphalt better for a Texas driveway?
Asphalt costs less to put in, about $4 to $8 a square foot, and it’s the comparison people ask about most. But asphalt doesn’t hold up to Texas heat. Its binder softens when the pavement surface reaches 130 to 140 degrees F, and a North Texas driveway gets that hot most afternoons from June through September. Parked tires leave ruts. Jack stands and trailer feet sink in. The apron, where you pull in off the street, wears out first.
A concrete driveway poured to spec lasts 30 to 40 years. Asphalt in the same heat lasts 12 to 20, and it needs a seal coat every two to three years. Add it all up, and concrete costs less to own by year eight on most Texas lots. Asphalt Institute design guidance admits the heat limit. We just see it more often than most of the country does.
When is the best time to pour a concrete driveway in Texas?
March through May, and late September through November. Highs of 60 to 80 degrees F, moderate humidity, and steady ground moisture make those the easiest months to cure a slab.
Summer pours need the full ACI 308 hot-weather steps. Winter pours need ACI 306 cold-weather steps: warm mix water, insulated blankets over the slab, and the slab kept above 50 F for 72 hours. Around Wichita Falls and Decatur, that comes up on three to five hard freezes each January and February. East Texas sees one or two a season.
Book six to eight weeks ahead for the spring or fall window. Summer and winter slots open sooner, but the extra weather steps add a surcharge.
What upgrade options add cost?
Upgrades change the look more than how long the driveway lasts.
Stamped concrete adds $3.93 a square foot over a plain broom finish. While the slab is still soft, we press in pattern mats: slate, ashlar, brick paver, or cobblestone. Once it cures, we seal it. Texas heat works against stamping. When the slab loses water too fast, the color spreads unevenly.
Stain or chemical color is priced per job, since it isn’t one of the options in the driveway quote tool. Acid stain reacts with the cement to give a see-through (translucent) finish. Water-based stain gives a more even color. Both need a sealed topcoat, redone every two to three years.
Exposed aggregate adds $1.40 a square foot. Before it sets, we wash off the top layer of cement paste. That lets the natural color of the river gravel or limestone in the mix show through. Red River pit gravel and East Texas sandstone look richer than the limestone used in much of Oklahoma.
Stamped and decorative driveways fail more often in Texas than in cooler states, and curing is the reason. A stamped slab needs its color to stay even across the whole pour. It also needs the top to stay soft long enough to take the pattern mat. North Texas summers fight both. The sun pulls cement paste out of the top quarter inch faster than the color can blend in. And the soft window for stamping shrinks from 90 minutes to 30 within an hour of the pour. The stamped slabs that come out clean are poured at 7 AM, with a crew misting the surface, the evaporation retardant ready before bull floating, and the joint pattern walked before the trucks show up. Skip any one of those on a stamped pour, and you lose the finish you paid for. It usually shows first at the apron.
Should you bundle the pour with a polished garage floor?
If you want a polished garage floor too, pour it with the driveway. It’s the cheapest way to upgrade both. You get the same crew, the same mixer trucks, and the same forming and finishing tools on site. A slab that will be polished has to be poured for it: a 4,000 PSI minimum mix, FF 35 flatness (a score for how flat the floor is), no acrylic curing compound, and saw-cut joints inside 36 hours. So the polish decision has to come before the truck order goes in. We call this Pour-4-Polish: one plan for the pour and the polish, made before any concrete shows up. A garage slab poured wavy, or with a 3,000 PSI mix, can’t be polished at any price. The only fix is grinding and resurfacing, and most homeowners pay twice.
See what your Texas driveway costs
Enter your address, square footage, and finish. The quote tool gives you a price range based on your part of Texas, the soil, and current concrete prices. No phone call, no consultation form.
A driveway is the first thing a visitor sees, and the last thing to fail when the spec is right. See what your Texas driveway costs and book the pour for the part of Texas and the season that fit your project.