How much does a concrete driveway cost in Mississippi?
In North Mississippi, a concrete driveway costs $6.96 to $16.43 a square foot with us. The low end is a plain broom finish with fiber in the mix instead of rebar. The top is stamped, with rebar, a wet-look sealer, and tear-out of an old drive. A 400-square-foot, two-car driveway comes to $3,000 to $7,050 before the drive cost, which is our trip out to you. Forms, concrete, finishing, and the cure are all in that total.
Two things that set the North Mississippi price
The first is the damp heat. NWS climate summaries for the Tupelo area put humidity at 75 to 85 percent all year, and July heat is hard on a fresh slab. The second is where the soil changes. Tombigbee prairie clay, a sticky clay that swells when it gets wet, runs through Lee, Pontotoc, and Monroe counties. The red clay hills around Oxford and Holly Springs drain better. On any bid, ours or someone else’s, look for these three things in writing:
- A 4,000 PSI mix with 4 to 6 percent air per ACI 318
- At least 4 inches of concrete for cars, and 6 inches for an RV or shop truck
- Packed soil or a crushed rock base on prairie clay lots
Our own standard beats that minimum: a 5-inch slab of 4,500 PSI concrete on packed gravel, with rebar. For how we build the slab, see Mississippi concrete flatwork. This page sticks to dollars.
What does a driveway cost at each size?
| Layout | Size (ft) | Square Feet | Total, before the drive cost |
|---|---|---|---|
| One-car pad | 12 x 20 | 240 sf | $1,900 to $4,450 |
| Two-car drive | 20 x 20 | 400 sf | $3,000 to $7,050 |
| Three-car drive | 20 x 30 | 600 sf | $4,350 to $10,300 |
| Long country lane | 10 x 100 | 1,000 sf | $7,100 to $16,750 |
Each total carries the job’s setup, so a small slab lands above the per-foot range. The truck day, the finishing crew, and the forms cost about the same on any size job. So a 240-square-foot pad pays the most per foot. Past about 800 square feet, the price per foot drops toward the low end. Long ranch drives in Pontotoc, Monroe, and Chickasaw counties often price best of all, since a straight run has few corners and less edge form to set.
How much more do color, stamping, or exposed stone cost?
| Finish Type | Mississippi $/sf | Build Notes |
|---|---|---|
| Broom finish, with rebar | From $8.64 | Mix per ACI 318, 4 to 6 percent air |
| Color in the mix | Adds $1.52 | Color all the way through; ages well |
| Exposed aggregate | Adds $1.40 | Surface retarder + rinse |
| Stain, after the cure | Priced per job | Acid or water-based stain |
| Stamped | Adds $3.93 | Color hardener, release, sealer |
Our broom price includes rebar. Swap the rebar for micro fiber, and the price drops toward the bottom of our per-foot range. Stamping a drive that has rebar puts it at $12.57 a square foot, because the pattern takes extra material and crew hours. Stain has no set line in our price list, so we price it once we’ve seen the slab. Exposed aggregate works well in Starkville, Columbus, and West Point. The rough, stony top hides fine heat cracks. It also holds up to the brine MDOT spreads on the rare icy morning.
What pushes the price up or down?
Size. A bigger slab costs less per foot. The total bill still grows with every foot you add.
Thickness. Most home drives around here are 4 inches thick, and ours start at 5. Once you park an RV, a fifth-wheel, a boat trailer, or a work truck on it, go to 6 inches. The quote tool prices that thickness, with a slider you can move to see the change.
Steel. Our base driveway price includes #4 rebar tied on an 18-inch grid, at $2.12 a square foot. That’s half-inch steel bar laid both ways, and it handles truck loads. On cars and firm ground, you can trade it for welded wire mesh ($0.63), micro fiber ($0.32), or macro fiber ($0.72). Fiber mixes right into the concrete.
Access. When the truck can chute straight from the street into the forms, the day goes fast. A pour behind the house, up a slope, or on a tight downtown Tupelo or Oxford lot needs a pump truck at $1,780 flat.
How does the soil change the price?
North Mississippi crosses three kinds of ground. Tombigbee prairie clay through Lee, Pontotoc, Monroe, and Lowndes counties swells and shrinks. It usually needs 4 to 8 inches of crushed rock before any concrete goes down, and we price that extra fill per job, after we see the lot. The red clay hills in Lafayette, Marshall, and Tippah counties drain much better, though a sloped lot still wants a packed base. Sandy loam pockets in Tate and DeSoto counties need the least fill.
Watch for bids that skip air entrainment
Air entrainment means tiny air bubbles mixed into the concrete, so freezing water has room to go. A North Mississippi driveway without enough air (per ACI 318) can flake and pop within 5 to 8 winters, however thick it is. The air costs nothing extra at the plant. But a low bidder may order plain 3,000 PSI concrete and never ask for it. Ask to see the mix ticket before you sign.
How does the price change across North Mississippi?
Our North Mississippi team covers the area from Oxford in the west to the Golden Triangle (Starkville, Columbus, and West Point) in the east. Corinth sits up at the Tennessee line, and Grenada marks the south end. DeSoto County, Holly Springs, and Batesville get their crew from our Memphis team.
| Sub-Region | Cities | What moves the price |
|---|---|---|
| Tupelo Metro / Lee County | Tupelo, Saltillo, Verona, Pontotoc | Short drive; prairie clay may need more rock |
| Oxford / Lafayette | Oxford and Lafayette County | Red clay hills drain well; longer drive |
| Golden Triangle | Starkville, Columbus, West Point | Prairie clay; longer drive, so pair jobs |
Our price per foot on a North Mississippi driveway stays the same from town to town. Three local things make one quote higher or lower than another. First is the soil. Tombigbee prairie clay swells, the Lafayette County red clay hills drain, and sandy loam in Tate and DeSoto counties needs little fixing. Second is the kind of work. Tupelo leans toward homes and small shops. Oxford and Lafayette County are mostly homes near the campus. The Golden Triangle pairs barndominium pads with shop slabs. Third is the drive on any job under 400 square feet, where the trip is a big share of the bill. Saltillo (10 miles), Verona (8 miles), and Pontotoc (15 miles) sit closest to Tupelo.
The weather counts too. Our freezes are milder than Missouri’s or Tennessee’s. Even so, every home pour needs air in the mix, the right thickness, and a curing coat sprayed on right after we finish.
What do add-ons cost?
| Add-on | Cost |
|---|---|
| Tear out an old slab | $2.30/sf |
| More rock for clay or slopes | Priced per job, once we see the soil |
| Swap rebar for wire mesh | Saves $1.49/sf |
| Swap rebar for micro fiber | Saves $1.80/sf |
| Swap rebar for macro fiber | Saves $1.40/sf |
| Color in the mix | $1.52/sf |
| Stamped pattern | $3.93/sf |
| Go from 5 to 6 inches | The quote tool prices that thickness |
| Pump truck | $1,780 flat |
Tear-out catches a lot of homeowners off guard. It’s charged on every foot of the old slab, before the first ready-mix truck shows up. The rate is for a plain 4-inch slab, so a thicker drive, one full of rebar, or an asphalt one can cost more.
Is concrete a better buy than gravel or asphalt?
| Surface | Cost per sf | Years | Upkeep |
|---|---|---|---|
| Gravel | Lowest up front | 5 to 10, then new rock | Regrade yearly, pull weeds |
| Asphalt | $3 to $6[1] (national market) | 12 to 18 in Mississippi | Seal every 2 to 3 years |
| Broom concrete, with rebar | From $8.64 | 25 to 30 | Little; seal now and then |
| Stamped, with rebar | $12.57 and up | 25 to 30 | Seal every 3 to 5 years |
| Pavers | $7 to $20[2] (national market) | 25 to 50 | Sand joints, pull weeds yearly |
Concrete costs more to put in than asphalt or gravel. Asphalt needs a seal coat every 2 to 3 years to hold together in our heat, and it wears out in about half the time concrete lasts. Gravel needs new rock and a regrade on a schedule. On broom concrete, a sealer now and then is the main chore. Gravel still wins on a tight day-one budget, which is why it covers so much rural acreage in Pontotoc, Monroe, and Chickasaw counties. Over 25 years, though, the rock hauls and labor on a gravel drive keep adding up.
Pour-4-Polish for bundled driveways
Every pour we do follows the same four steps, one spec from dirt to finish:
- Set. Stake the corners, build the forms, and pack and grade the soil so water runs off.
- Portland. Lock in the mix with the plant before the truck rolls.
- Even. Place the concrete, screed it flat, and bring up the broom or stamp finish evenly across the slab.
- Cure. Spray on a curing coat that holds the water in while the slab gains strength.
Add a patio, sidewalk, garage slab, or barndo pad to the same trip, and you pay for one trip and one setup, not two. A 600-square-foot driveway poured with a 400-square-foot patio costs less per foot than the two jobs billed on their own. The Pour-4-Polish process page walks through every step.
Bundle driveway with patio or shop slab for savings
The trip is charged once, not by the foot. Tell us about every slab you have in mind when you ask for a price. With the crew already on site, the forms up, and the concrete ordered, the price per foot comes down.
How far is the drive to your job?
| Project City | One-Way |
|---|---|
| Tupelo, Saltillo, Verona | 0 to 15 miles |
| Pontotoc, New Albany | 15 to 30 miles |
| Oxford | 50 to 65 miles |
| Starkville, Columbus, West Point | 50 to 75 miles |
| Corinth, Booneville | 50 to 75 miles |
| Grenada | 80 to 95 miles |
The first 40 road miles each way are free. Past that, the drive cost grows with each extra mile. Put your address into the online quote tool, and it adds that charge as its own line.
What is included in a driveway quote?
Every bid we send is written out line by line, so you can check each choice.
In the price:
- Layout and form setup
- Grading and packing the soil
- A 4-inch crushed rock base
- #4 rebar, or wire mesh or fiber for less if you swap
- A broom texture on the top
- A 5-inch slab of 4,500 PSI concrete with air mixed in, per ACI 318
- Control joints saw-cut every 8 to 10 feet
- A spray-on curing compound per ACI 308R
- Pulling the forms and cleaning up
- The first 40 road miles of the trip from our North Mississippi team
Priced as separate lines, so the base stays honest:
- Tearing out an old slab
- Fill past normal soil prep
- Any thickness past 5 inches
- Decorative finishes: stamps, stain, or exposed stone
- Drainage past the edge of the slab
- A pump truck
- City permits
Why do driveway bids come in so far apart?
The mix. When a bid comes in far under the rest, the savings usually come from plain 3,000 PSI concrete with no air in the truck. Skip the air, and the top can start to flake within 5 to 8 winters.
The ground work. Some bids skip packing and checking the soil on Tombigbee prairie clay. Others pour right onto a raw red clay slope in the hills. Either one sets up cracks that show two or three Mississippi summers later.
The cure. Concrete reaches full strength over 28 days, but the first 7 days matter most. A Friday pour left alone over a Mississippi weekend takes a beating from the afternoon heat and the damp nights. The slab shows it within a year.
How to get a quote
Start with the online quote tool. Give it the slab size, the address, the finish you like, and what sits on the ground today. If something about the lot is unusual, we come look at it in person before we give you a number.
See what your Mississippi driveway costs
Enter your driveway size and where it is. The tool adds the trip, the steel, and the finish, then shows you a real installed number.
Related Mississippi pages
- Mississippi concrete flatwork service covers how we build slabs, walks, and patios across North Mississippi
- Mississippi polished concrete cost
- Mississippi garage floor coating cost for epoxy and polyaspartic coatings on home garages
- Mississippi barndominium slab
- Tupelo and Oxford city pages
- Mississippi state hub
- Pour-4-Polish process from start to finish
- National concrete driveway cost guide
Where these market figures come from
Every price on this page that is not ours is listed here. Our own rates carry no number: they link straight into the quote tool.
- Asphalt driveway, installed (national range): $3 to $6 per SF. Concrete Network, "How Much Does a Concrete Driveway Cost? 2026 Prices" (updated 2026-01-13), retrieved 2026-10-26. Quoted as published: "asphalt installation averaging $3 to $6 per square foot".
- Concrete pavers, installed (national range): $7 to $20 per SF. Concrete Network, "Stamped Concrete vs Pavers: What are the Differences?", retrieved 2026-10-26. Quoted as published: "Concrete Pavers Cost: $7 to $20 per square foot (installed)". The page shows no updated date.
Pricing in Mississippi
In Mississippi, most projects range from $6.96 to $16.43 per square foot. Final cost depends on floor condition, area size, and finish selection.
Get your custom quoteFrequently asked questions
How much does a concrete driveway cost in Mississippi?
Does a Mississippi concrete driveway need to be thicker because of clay soil and humidity?
Is a concrete driveway cheaper than asphalt or gravel in Mississippi?
How does Tombigbee prairie clay or red clay hill soil affect driveway pricing?
What is included in a Bel Covo Mississippi concrete driveway quote?
Can Bel Covo bundle a driveway with other Mississippi concrete work?
Last updated:
Ready to transform your floor?
Get a free, no-obligation quote from our team.