- Concrete Craftsmen Since 2004
- St. Louis Metro Coverage
- Slabs Built for the Finish
- On-Site Moisture Testing
Concrete flatwork in St. Louis, Missouri
Concrete flatwork in St. Louis, Missouri runs $5.32 to $15.61 a square foot with us. The thickness, the steel, and the finish decide where your slab lands in that range. It covers barndo pads in St. Charles County, garage slabs behind city homes, warehouse floors in Chesterfield Valley, and 4-inch patios in Kirkwood.
Some people call it cement flatwork. Cement is the powder that binds the mix, and the slab itself is concrete. We work from the city out across St. Louis County and into St. Charles, Jefferson, and Franklin counties.
A polished concrete floor only looks like glass at year ten if the slab under it went down flat on day one. A garage floor coating bonds best to a slab poured with that coating in mind. So we size every pour to the flatness the finished floor needs. The Missouri concrete flatwork guide has the state-wide spec detail.
What do we pour across the St. Louis metro?
Home drives, patios, garage pads, and pool decks. A lot of this is tear-out and repour work on older homes in Webster Groves, Kirkwood, and Ladue. A 4-inch patio or walk gets 6x6 W1.4 welded wire on chairs, over 4 to 6 inches of packed MoDOT Type 5 crushed stone. A 16-by-20 patio behind a Kirkwood remodel takes about 4 cubic yards and gets finished in one morning.
St. Charles County barndo and shop pads. Barndos around O’Fallon, Wentzville, Foristell, and Lake Saint Louis go up on 5 to 40 acre lots, and they’re a big share of our work here. A barndo you live in gets 5 to 6 inches with #4 rebar on 18-inch centers. A shop for tractors, UTVs, or skid steers gets 6 to 8 inches with rebar on 12 to 18-inch centers. Its perimeter footings get sized to the wall load on the steel building plans.
Commercial flatwork. We pour warehouse floors, fleet pads, and loading slabs from the I-270 belt at Earth City to Chesterfield Valley and the I-70 strip in St. Charles. As a commercial flatwork contractor, we also work out I-44 toward Eureka and Pacific. We also do repair and overlay work on the North Riverfront. Those pours follow ACI 302.1R and ACI 360R for joints, flatness, and curing.
Pour-4-Polish slabs. These get polished later, so we write the pour spec for the floor that goes on it. One spec, one schedule, and one warranty on the workmanship cover the pour and the polish. See Pour-4-Polish for the full process.
Where do St. Louis slabs succeed or fail?
Most slab failures here start in the ground under the slab, not in the concrete. The metro has three kinds of ground inside an hour’s drive:
- River clay. Mississippi and Missouri river-valley clay covers the St. Charles bottoms, north St. Louis County, and the low parts of Florissant.
- Karst. South county and the Meramec valley through Jefferson County sit on limestone with hidden holes in it, called solution voids.
- Loess over bedrock. Loess is a fine silt the wind laid down. Over rock in Webster Groves, Kirkwood, Ladue, and Town and Country, it holds a plain 4-inch home slab with no extra steel.
So we check the ground under every barndo and shop pad in St. Charles, Jefferson, and Franklin counties. Where it’s soft, we dig it out. In karst country, we thicken the slab edges. On home and commercial pads, we lay 4 to 6 inches of crushed stone base, usually MoDOT Type 5. Then we run a plate compactor over it in overlapping passes until it stops giving. Any slab inside a building, or any slab that will be polished or coated later, gets a 15-mil vapor barrier right under the concrete. That sheet meets ASTM E1745.
What mix design works for St. Louis concrete?
St. Louis ready-mix comes from plants along I-70, I-64, I-44, I-270, and I-55. Quality varies by plant and by where the rock comes from, so we order by PSI (the strength rating, in pounds per square inch), cement content, water to cement ratio, air, and rock size, per ASTM C94 and ASTM C150.
- A driveway gets a 5-inch slab with rebar and a 4,500 PSI mix with air in it.
- A shop slab gets 4,000 PSI with the cement content adjusted for the load.
- A Pour-4-Polish slab inside gets 4,500 PSI with no added air. We hold its cement content steady, because spots rich in cement paste polish unevenly.
Outdoor flatwork gets 4 to 7 percent air per ACI 318. Those tiny bubbles give freezing water room to grow, and St. Louis sees 65 to 70 freeze-thaw cycles a year. A slab with air is still smooth at year ten. A slab without it can be spalled and pitted by year three. We can also seal outdoor slabs with a penetrating siloxane, which keeps out water and road salt for 3 to 5 years.
How do we handle placement and finishing?
Flatness matters more than most owners think. ACI 117 sets normal slab tolerance at FF 25 to 35. FF is the flatness number on a spec sheet, and higher is flatter. FF 25 is fine under a carport in Wentzville, but it shows as waves under a polished finish. For Pour-4-Polish work, we aim for FF 50 or higher. We get there with a laser screed, or a wet screed on smaller pours. We bull-float once before the bleed water comes up, then trowel in timed passes that follow the humidity. We usually saw-cut the joints within 12 hours of the pour, per ACI 224R.
Outdoor flatwork gets a broom finish for grip. Inside, we steel-trowel or flat-trowel to suit the floor going on top. From June through August, we start pours at first light and spray an evaporation retarder between passes. On a broom-finish slab, we spray on a curing coat as soon as we finish, per ACI 308R. It holds water in the slab while it gets strong. A Pour-4-Polish slab gets a 7-day wet cure under plastic instead, so there’s no curing coat to grind off later.
Pour day tells the whole story
A perfect mix poured at 2 PM in August under full St. Louis sun will finish worse than a standard mix poured at 6 AM. So we book metro pours by the weather, not the calendar. We walk you through the schedule before the ready-mix truck pulls up to a Soulard alley or a Wentzville pad site.
Who is a St. Louis flatwork quote right for?
A St. Louis flatwork quote fits a barndo on acreage in St. Charles County, where the slab is also your floor. Tell us the finish you plan: raw broom, sealed, polished, or coated. We set the mix, the steel, and the cure to match it. A slab you’ll polish gets the 7-day wet cure.
- Jefferson County homes and shops around Hillsboro, House Springs, De Soto, Arnold, and Imperial sit on karst. We check for holes before the truck rolls.
- Inner-ring suburb homes on firm loess: a cracked drive, a new patio or pool deck, or a garage pad.
- City homes in Soulard or Lafayette Square replacing a carriage-house pad or back patio. Pump reach drives the pour-day plan.
- Commercial owners and tenants pouring warehouse floors, fleet pads, or restaurant kitchens. The joint layout and FF/FL flatness numbers have to suit the finish on top.
- General contractors on barndo, commercial, or apartment schedules. We treat the pour as the start of a finished floor, not the end of a rough trade.
Options that change the price
- Thickness. 4 inches for light home use. 5 to 6 inches for shops and St. Charles barndos. 6 to 8 inches for heavy equipment, vehicle storage, or warehouse pads. The quote tool has a thickness slider from 3 to 10 inches.
- Steel. Fiber mesh for walks, welded wire for standard slabs, and rebar for shops and commercial pours. #4 on 18-inch centers adds $1.49 a square foot over wire mesh. Post-tension cable for big warehouse spans with few joints is priced per job, from the plans.
- Finish. A light broom outside. A hard steel trowel on shop slabs that will be coated. On a Pour-4-Polish slab, a fresno pass and then flat-trowel passes, with no late pass that burns the surface dark.
- Vapor barrier. The 15-mil sheet under an inside slab runs $0.60 a square foot.
- Joints. Saw-cut every 8 to 12 feet on home work. Laid out per ACI 224R on commercial work. Few joints on post-tension slabs.
- Color or a decorative release. Spec’d at the mix stage, not added on top later.
What should you expect on pour day?
A flatwork installation for a St. Louis home usually books across two working days.
- The day before the pour, we check the ground, set the forms, and place the steel.
- On pour day, placing takes three to six hours, depending on yardage.
- Then we make a fresno pass and timed trowel passes that follow the humidity, not a clock.
- You can usually walk on the slab within 24 hours in normal metro weather. Keep cars and building traffic off it for the first 7 days while it cures.
A slab that will get a coating or other finished flooring needs about a month to dry first. For polish, we can make the first cut as soon as 10 days, depending on the weather during the cure.
Does a Pour-4-Polish slab cost more?
A little, on the pour. A standard inside slab with a light trowel finish starts at $5.55 a square foot. The Pour-4-Polish placement, a 4,500 PSI mix placed to FF 50 or better, starts at $6.19. That’s about $0.64 more. The 7-day wet cure adds $0.14 a foot.
The polish costs less, though. On its own, our polish starts at $3.58 a square foot. When we pour that slab for you, the quote takes 30% off the field and edge polishing, because the flatness and cure are already where the polish needs them. A wavy slab we didn’t pour can leave low spots that stay dull or cost extra to fix. And a Pour-4-Polish slab finishes visibly tighter under light, in a barndo living room or a Chesterfield Valley showroom.
Related St. Louis and eastern Missouri pages
The sibling pages for St. Louis are polished concrete, garage floor coatings, and concrete driveway cost. The Missouri concrete flatwork state guide carries the ACI spec detail, and the Missouri state hub lists every service we offer in the state.
See what your St. Louis flatwork costs
Enter your St. Louis slab, driveway, or St. Charles barndo pad. The quote tool lists the drive cost (our trip to your site) and gives you a price in about two minutes.
Frequently asked questions
What does concrete flatwork cost in St. Louis, Missouri?
How does Jefferson County karst affect a slab pour around Arnold, Imperial, or House Springs?
What slab design works for a St. Charles County barndominium on 5 to 40 acres?
How deep does the frost-protected perimeter need to be across the St. Louis metro?
Can you handle ready-mix sourcing for a tight urban-infill pour in St. Louis City?
Last updated:
Ready to transform your floor?
Get a free, no-obligation quote from our team.
