Skip to main content
Bel Covo
concrete overlay residential front walkway prague

Concrete flatwork in Collierville, Tennessee

  • Concrete Craftsmen Since 2004
  • West Tennessee Coverage
  • Slabs Built for the Finish
  • On-Site Moisture Testing

Concrete flatwork in Collierville, Tennessee

Concrete flatwork in Collierville, Tennessee is mostly custom-home driveways, patios, barn aisles, and barndo slabs. When one cracks here, the clay under it is usually why. So every job starts below the concrete. We pack the native clay to 95 percent and lay 4 to 6 inches of crushed stone first. Our Memphis team covers town limits, the Eads horse farms, Houston Levee acreage, and out to the Fayette County line.

That slab sits under whatever comes next, from a polished concrete floor to a garage floor coating. The statewide spec is on the Tennessee concrete flatwork page.

What do we pour on a Collierville site?

A town-limit lot and an Eads farm need different slabs, and we often pour both in one week.

  • Sidewalk, patio, or pool deck: a 4-inch slab with 6x6 W1.4 welded wire mesh on chairs, over 4 to 6 inches of packed crushed stone.
  • Driveway: our standard driveway quote is a 5 inch slab on a packed gravel base, with #4 rebar on 18-inch centers, a 4500 PSI air-entrained mix, and a spray-on cure.
  • Barndo with living space: 5 to 6 inches with #4 rebar on 18-inch centers.
  • Equipment shop or tractor barn: 6 to 8 inches with rebar on 12 to 18-inch centers, plus footings sized for the post-frame walls.
  • A floor you’ll polish or coat: a Pour-4-Polish slab, with a vapor barrier under it and a 7-day wet cure.

On custom homes, that means driveways that climb up from Poplar Avenue, patios that look out on pasture, and pool decks behind Bray Station houses. It also means walks out to a side garage, and basement floors on lots that step down toward the Wolf River bottom. A 24-by-30 patio behind a Schilling Farms two-story takes around 7 to 9 cubic yards of concrete, and when the weather holds, we have it finished in one morning.

Horse property is the other big share of the work. We pour wash racks, tack rooms, barn aisles, run-in shed pads, and arena slabs across Eads and the acres east of Town Square. A wash rack gets a set fall to stainless drains on the low line. Its broom finish is stiff enough that a wet hoof won’t slide. An aisle gets a sealed work floor or a polished floor with the stone showing.

How do we lay out barndo, commercial, and Pour-4-Polish slabs?

Barndos started out rural. Now they show up on the bigger lots in east Collierville and on parcels along the Fayette line. We lay out the joints to match the framing grid, so a saw cut never lands under an inside wall or a future tack-room divider.

Commercial work here means store pads, restaurant kitchen slabs near Town Square, and office pours along the Schilling Farms business strip. Those slabs follow ACI 302.1R. It’s the trade guide for joint layout, flatness, and cure.

A Pour-4-Polish slab is built from the dirt up so the polish has the flatness, cure, and surface it needs. It takes a different mix, a different finishing window, and a different cure. One spec governs all of it, from the subgrade to the final burnish. The full process is on our Pour-4-Polish page.

Where do Collierville slabs fail?

Most cracked slabs in Collierville failed in the dirt, not in the concrete. The town sits on Mid-South silty clay on the high ground above the Wolf River. That clay swells with winter rain and shrinks in late-summer drought, and the slab moves with it. Town Square and most of Schilling Farms and Bray Station sit high enough to drain well. But lots that step down toward the Wolf River north of town, or toward the Nonconnah headwaters to the southwest, sit on river soil. There the water table is shallow, and ground water wicks up into the slab.

On those low lots, we probe the dirt before any shop, barn, or barndo forms go down, and where the top layer is soaked, we dig it out and put graded stone in its place. Every pad gets a base. That’s 4 to 6 inches of packed crushed stone over clay packed to 95 percent Proctor density.

Under any indoor, polished, or coated slab, we lay a 15-mil plastic vapor barrier. It’s one of the cheapest lines on the bid, and it’s the one other crews skip first. Skipping it saves a little now. Then it shows up as white rings on the floor or a coating that lets go inside two years.

Which mix fits a Collierville pour?

Ready-mix here comes from the plants that serve Shelby, Fayette, and DeSoto counties, and the Mid-South rock in it is a blend of river gravel, limestone, and chert, all in the same trucks. Chert gives a polished floor a warmer tone. It also grinds evenly under diamond tools and holds up fairly well to foot traffic.

We write each mix by strength (PSI), cement type (ASTM C150), water-to-cement ratio, air content (ASTM C260), and rock size (ASTM C33). A loose strength class never goes on our pour ticket. The mix changes with the slab:

  • A Schilling Farms driveway gets our standard 4500 PSI air-entrained driveway mix.
  • A Houston Levee barn aisle runs 4,000 PSI, with the cement set for the longer finishing time an aisle needs.
  • A Pour-4-Polish floor indoors gets 4,500 PSI with no added air. We hold the cement paste steady, so the polish sees the same surface from the first cut to the last burnish.

Outdoor slabs get 4 to 7 percent air per ACI 318. Collierville sees 40 to 50 freeze-thaw cycles a winter. Each one pulls water deeper into the slab’s pores, and road salt on Bill Morris Parkway and the Town Square approaches makes it worse after an icy morning. So we suggest a penetrating siloxane sealer on top, which soaks in and keeps out water and salt. Skip the air and the top spalls, which means it flakes off in chips. Get it right and the surface still looks tight in year ten.

How do we place and finish a Collierville pour?

Flatness drives the finished look. FF is the flatness number you’ll see on a slab spec, and higher is flatter. ACI 117 sets general slab tolerances at FF 25 to 35. That’s fine for a carport. Under a polished great room with light coming in a west window, it shows as waves. Pour-4-Polish work targets FF 50 or higher. We use a laser screed on bigger pours and a wet screed on smaller rooms, bull-float once before bleed water rises, and then trowel in timed passes matched to the humidity that day.

We saw-cut the joints within 6 to 18 hours of the pour, per ACI 224R guidance. Most get cut by about 12 hours, and summer pours get cut at the early end, since the slab starts to shrink sooner in the heat.

Outdoor slabs get a broom finish for grip, on driveways off Poplar Avenue and on barn aprons out to the wash rack. Indoor slabs get a steel or flat trowel finish to suit the floor that goes on top. From June through August, we start at first light. Mid-South heat pulls water off a fresh slab fast, so we spray a film between passes to slow it down. Outdoor slabs then get a spray-on cure. A slab we pour to polish gets the 7-day wet cure under plastic, per ACI 308R.

The pour schedule matters more than the mix

A great mix poured at 2 PM in August under full sun ends up worse than a plain mix poured at 6 AM that day. So we set Collierville pours by the weather, not the calendar. And we go over the plan with you before the truck heads up Poplar Avenue.

What does a Pour-4-Polish slab cost on a Collierville custom home?

A standard 3,500 PSI indoor slab with a light trowel finish starts at $5.55 a square foot. Swap in our Pour-4-Polish pour, with a 4,500 PSI mix and a flat trowel finish, and it starts at $6.19. That’s $0.64 more a foot. The 7-day wet cure and the rebar we suggest for that slab are their own lines on the quote.

Polish on that slab starts at $3.58 a square foot. And when we pour the slab to polish, you save 30% on field and edge polishing, because the flatness and the cure are already right where the polish needs them. You can still polish a standard slab later. But waves, dark burn marks from late trowel passes, and a leftover curing coat all mean more grinding. Low spots cost extra. The Pour-4-Polish floor also looks tighter in the daylight from a south-facing Schilling Farms window.

What should Collierville property owners know about flatwork permits and travel?

Permits and 811. Inside town limits, Collierville sets the spec and permit rules for public sidewalks and driveway aprons. The same goes for any work near the Town Square historic district line. Rural work out in eastern Fayette usually doesn’t need a permit. On every job, Tennessee 811 marks the buried lines before we dig, and we put that on the schedule along with the form layout.

Pairing jobs. We often pair a Collierville pour with Germantown, Eads, or Houston Levee work in the same week. Our drive to your site is its own line on the bid, so a Town Square shop apron and a Schilling Farms patio each show their own travel cost.

For other Collierville services, see Collierville polished concrete and Collierville garage floor coatings. For the city next door, see Memphis concrete flatwork and Memphis polished concrete. The statewide spec is in the Tennessee concrete flatwork guide. The Tennessee state hub lists every service we offer in the state, and the Collierville city page covers the local market. Our concrete flatwork service page holds the full mix, flatness, and joint specs.

See what your Collierville concrete flatwork project costs

Tell the quote tool about your Collierville slab, driveway, or barndo pad. It adds our drive to your place as its own line and gives you a price in about two minutes.

For a quick estimate, start the quote calculator.

See the results

Ground-level close-up of completed white vinyl chip epoxy floor showing chip texture and depth with service counter visible in distanceCompleted white vinyl chip epoxy floor in Ladd's showroom with worker in background and Club Car branding bannersCompleted white vinyl chip epoxy floor at Ladd's showroom looking toward service counter and green accent wallReflective brown polished concrete floor with fully exposed stone aggregate.Glossy brown polished concrete floor with exposed aggregate beside built in cabinets.full exposure polished concrete floor in a residential great room by Bel CovoFreshly stamped concrete overlay with dark wood plank pattern showing detailed grain textureSunlight illuminating stamped concrete wood plank overlay revealing grain texture and warm tonesConcrete overlay with realistic wood plank texture and grain detail, dark brown stainDark wood-look concrete overlay in residential kitchen with white and navy cabinetry during constructionStamped flagstone concrete overlay on residential patio in Owasso OklahomaTextured flagstone concrete overlay detail along pool edge in Owasso Oklahoma

Frequently asked questions

What does concrete flatwork cost in Collierville, Tennessee?

A plain 4-inch slab with welded wire mesh over packed crushed stone starts at $5.55 a square foot in Collierville. Swap the mesh for #4 rebar, the steel we use for shop, barn aisle, and barndo slabs, and it starts at $7.04. A 6-inch slab costs more for the extra concrete, and the quote tool prices that thickness. A stamped patio on a Schilling Farms or Bray Station home starts at $10.48 a square foot. Commercial slabs built to ACI 302.1R are priced per job from the plans, since thickness and the flatness target move the number. On any job, gated-subdivision access, clay prep, the steel schedule, and moisture work on low parcels south of Bill Morris Parkway move your price more than any average does. Our drive to your site is its own line on every quote.

How does Mid-South alluvial clay affect a Collierville slab?

The clay under Collierville swells when it's soaked and shrinks when it dries. In the worst spots that swing can move the ground an inch up and down. A slab poured on loose native clay rides that movement, and it cracks along its weakest lines within three years. So we dig to an even depth and pack the native clay to 95 percent Proctor density, which is the packing number you'll see on a bid. Then we lay 4 to 6 inches of graded crushed stone to break the rise of ground water and spread the load, and we pack that stone just as tight. On commercial pours, and on any barndo or horse barn slab, we check that density with a nuclear gauge. Skipped packing on Shelby County clay is the most common reason flatwork cracks early here.

Can you pour an equestrian barn aisle or wash rack on a Collierville or Eads property?

Yes. Eads and east Collierville hold a lot of the horse property in the Memphis area, and barn aisles, wash racks, tack rooms, and run-in shed pads are regular work for us in Shelby County. Each one carries a different load. A wash rack needs slope, stainless drains set on the low line, and a broom finish that grips a wet hoof. A tack room does best with a sealed floor that stands up to cleaners strong enough to strip a urethane finish. A carriage-house living space can take a polished floor with the stone showing, so it looks like a room and not a barn. Our Pour-4-Polish spec covers all of it, from the dirt prep to the final burnish, so one set of numbers governs the whole job.

Do I need air-entrained concrete for an exterior Collierville slab?

Yes, for any outdoor slab here. Air-entrained concrete holds tiny air bubbles, 4 to 7 percent of the mix by volume. Water in the slab expands into those bubbles when it freezes, so the top doesn't flake or pop off. Collierville sees 40 to 50 freeze-thaw cycles a year, depending on the winter, and the eastern Shelby and Fayette parcels run higher. Driveways, patios, sidewalks, barn aprons, and outdoor shop pads all get an air-entrained mix per ACI 318. Indoor slabs in heated and cooled space go without it, and so does any slab we pour to polish later, because the trapped air hurts the polished surface.

Last updated:

Ready to transform your floor?

Get a free, no-obligation quote from our team.